pub:projects:bimloq
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
pub:projects:bimloq [2011/04/18 07:32] – added Explicite seminar kkl | pub:projects:bimloq [2013/01/10 19:23] (current) – removed kkr | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Bimloq ====== | ||
- | {{ : | ||
- | The main aim of Business Models Optimization for Quality (BIMLOQ) is to build a declarative model for business processes, including business rules specification, | ||
- | |||
- | ===== Description ===== | ||
- | |||
- | ====Motivation==== | ||
- | |||
- | * **Semantic: | ||
- | * **Functional: | ||
- | * **Technical: | ||
- | |||
- | |||
- | ====Problem statement==== | ||
- | |||
- | |||
- | ====Expected benefits==== | ||
- | * Real-time quality assessment during development. | ||
- | * Maintainability assurance. | ||
- | * Formal analysis of business software quality. | ||
- | * High adaptability in dynamic environments. | ||
- | |||
- | |||
- | ====Intended results==== | ||
- | * **Conceptual: | ||
- | * **Practical: | ||
- | * new tools for analysis and optimisation of specification quality, | ||
- | * integration of visual BPMN tools and logical knowledge processing. | ||
- | * **Evaluative: | ||
- | |||
- | ===== News ===== | ||
- | |||
- | * **14.04.2011** //The BIMLOQ Project Overview// presentation during the Explicite Seminar ([[http:// | ||
- | |||
- | ===== Comments ===== | ||
- | |||
- | {{tag> | ||
- | |||
- | Go back to -> [[start|projects]] |
pub/projects/bimloq.1303111921.txt.gz · Last modified: 2011/04/18 07:32 by kkl