pub:projects:start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
pub:projects:start [2013/01/10 12:57] – external edit 127.0.0.1 | pub:projects:start [2016/02/19 10:32] – sbk | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | |||
====== GEIST Research Projects ====== | ====== GEIST Research Projects ====== | ||
Line 5: | Line 6: | ||
===== Current projects ===== | ===== Current projects ===== | ||
+ | ==== KnowMe ==== | ||
+ | {{: | ||
+ | [[.knowme: | ||
+ | which is a 20 months long NCN Preludium 7 project started in 2015-02. | ||
+ | The goal of the project is to propose methods for knowledge modelling and mediation in mobile context-aware systems, to support a user in adapting the system to his or her personal preferences and habits, and to improve management of uncertain and incomplete knowledge. | ||
+ | |||
+ | See [[http:// | ||
==== Prosecco ==== | ==== Prosecco ==== | ||
- | {{: | + | {{: |
- | [[Prosecco|Read more on Prosecco]] | + | [[.prosecco: |
which is a 32 months long NCBR PBS project started in 2012-12. | which is a 32 months long NCBR PBS project started in 2012-12. | ||
The goal of the project is to address the needs and constraints of small and medium enterprises (SME) by designing methods that will significantly improve their Business Process Management systems. | The goal of the project is to address the needs and constraints of small and medium enterprises (SME) by designing methods that will significantly improve their Business Process Management systems. | ||
Line 16: | Line 24: | ||
==== SaMURaI ==== | ==== SaMURaI ==== | ||
- | {{pub: | + | {{pub: |
- | [[SaMURaI|Read more on SaMURaI]], | + | [[.samurai: |
which is a 24 months long NCN project started in 2012-09. | which is a 24 months long NCN project started in 2012-09. | ||
The main objective of the project is | The main objective of the project is | ||
Line 25: | Line 33: | ||
==== HiBuProBuRul ==== | ==== HiBuProBuRul ==== | ||
- | {{: | + | {{: |
- | [[HiBuProBuRul|Read more on HiBuProBuRul]], | + | [[.hibuproburul: |
which is a 24 months long NCN project started in 2012-09. | which is a 24 months long NCN project started in 2012-09. | ||
The main objective of the project is | The main objective of the project is | ||
Line 34: | Line 42: | ||
==== INDECT ==== | ==== INDECT ==== | ||
- | {{: | + | {{: |
- | [[INDECT|Read more on GEIST participation INDECT]], | + | [[.indect: |
which is a large EU collaboration project coordinated by [[http:// | which is a large EU collaboration project coordinated by [[http:// | ||
The aim of the project is the development of an | The aim of the project is the development of an | ||
Line 46: | Line 54: | ||
{{: | {{: | ||
- | **[[.:Parnas:start|Read more on Parnas]]**, which was a 18 month long NCN project on // tools for inference control and quality analysis in modularized rulebases// | + | **[[.:parnas:start|Read more on Parnas]]**, which was a 18 month long NCN project on // tools for inference control and quality analysis in modularized rulebases// |
See [[http:// | See [[http:// | ||
Line 52: | Line 60: | ||
==== BIMLOQ ==== | ==== BIMLOQ ==== | ||
- | {{: | + | {{: |
- | **[[BIMLOQ|Read more on BIMLOQ]]**, which was 32 month long NCN project on //business models and processes optimization for quality//. | + | **[[.bimloq: |
See [[http:// | See [[http:// | ||
Line 59: | Line 67: | ||
==== HeKatE ==== | ==== HeKatE ==== | ||
- | {{: | + | {{: |
- | **[[HeKatE|Read more on HeKatE]]**, which was a 30 month long NCN project on //hybrid knowledge engineering methodology for knowledge-based systems//. | + | **[[.hekate: |
See [[http:// | See [[http:// | ||
Line 94: | Line 102: | ||
[[http:// | [[http:// | ||
+ | {{like> |
pub/projects/start.txt · Last modified: 2022/07/14 19:15 by kkt